Sample website by Makarios IT Solutions · All data is fictional · Get a site like this →
Tibay Builders PCAB LIC · EST. 2011 Get a quote
Construction site with steel framing against the sky

Site report · General contractor · San Fernando, Pampanga

Built right.
Built once.

Residential builds, commercial fit-outs, and renovations delivered on schedule — permits handled, every peso itemized, every week photo-logged for your records.

TB-SF · FIELD RECORD
PCAB licensed · 15 yrs in business
Itemized quotations · weekly photo log

210+Projects completed
96%On-time delivery
2 yrsWorkmanship warranty

Method statement

The build, in five phases

The same sequence on every job — so you always know which phase your money is in, and what has to pass before the next one starts.

SEC / 01
01Permits & design

Building, electrical, sanitary — filed by us, part of the contract.

Deliverable: signed plans
02Excavation & structure

Footings, columns, slab — inspected before a single wall goes up.

Deliverable: structural pass
03Fit-out

Roughing-ins, finishes, fixtures — billed only against completed milestones.

Deliverable: milestone billing
04Punch list

You walk the site, mark every defect, and we clear the list before turnover.

Deliverable: zero open items
05Turnover

Keys, as-built plans, and the full photo log — then we stay on call.

Covered: 2-yr warranty

Completed works

Project files

Every project photo-logged weekly for the owner's records. Three recent files, specs as delivered.

SEC / 02
PRJ-014 · CLARK Completed two-storey residence with clean modern facade

Two-storey residence

Design-and-build from bare lot to move-in: architectural design, permits, structure, and finishing under one contract.

Scope
Design + build, full permits
Floor area
180 sqm, two storeys
Duration
9 months, excavation to keys
Delivery
Turned over on the committed date

LOG: 38 weekly photo reports on file

PRJ-019 · ANGELES Interior structure and framing works in progress

Café fit-out

Bare commercial shell to opening day: layout, utilities, counters, and finishes sequenced so trades never blocked each other.

Scope
Commercial fit-out, shell to open
Floor area
85 sqm
Duration
7 weeks to opening day
Delivery
Passed inspection, first try

LOG: owner opened on the date printed on the launch posters

PRJ-023 · SAN FERNANDO Structural works on an occupied office renovation

Office renovation

Two floors re-planned and rebuilt while the company kept working — dust-controlled zones, night works for the noisy phases.

Scope
Renovation, occupied building
Floor area
Two full floors
Constraint
Staff kept working throughout
Delivery
Zero lost business days

LOG: dust-control screens inspected daily

Scope of works

Services index

SEC / 03
S-01

House construction

Design-and-build or plans-ready lots — from excavation to finish, one accountable crew end to end.

Design + build
S-02

Commercial fit-outs

Shops, cafés, and clinics — fast turnovers, sequenced trades, and works that pass inspection the first time.

Shell to open
S-03

Renovation

Kitchens, extensions, and structural retrofits with dust control — livable while we work.

Dust-controlled

Client record

From the owner's log

Entries from the people who signed the turnover sheets.

SEC / 04

ENTRY 038 · PRJ-014 CLARK · TURNOVER WEEK

"Turned over on the date they gave us nine months earlier. I still don't quite believe it."
— Engr. Lito S., Clark residence

ENTRY 022 · REMOTE OWNER · WEEKLY PHOTO LOG

"The weekly photo log meant I could check progress from Dubai."
— Marisol T., overseas owner

ENTRY 019 · PRJ-019 ANGELES · VARIATION ORDER

"Itemized quote, so when we changed the tiles we knew the cost the same day."
— Ronnie G., café fit-out

Contract terms, plainly

Straight answers

SEC / 05
Q-01Do you handle permits?

Yes — building, electrical, sanitary, and occupancy. It's part of the contract, not an add-on you chase separately.

Q-02How do progress payments work?

Billed against completed milestones, verified by your own inspector if you have one. No payment is due for work that hasn't passed.

Q-03What does the warranty cover?

Two years on workmanship, plus whatever the manufacturer gives on fixtures. If something fails, we come back and fix it.

Q-04Can we make changes mid-build?

Yes — with a written variation order showing the cost and any schedule impact before work proceeds.

Request for quotation

Planning a build?
Put it on paper.

Free site visit, then an itemized quotation in five working days — every line priced, nothing "to be discussed later."

PCAB licensed · itemized quotations · 2-yr workmanship warranty